Skip to content Skip to navigation

ProM Request archive

This is an archive of requests from 2013 to 2021. New requests are not being added here.
PROM Request Title PROM Date PROM Request Summary Equipment List PROM Decision
Nitric Acid and Sulfuric Acid for Oxygen Termination of Diamond 05/20/2021 Request for heated acid manual processing. Request approved.
Savannah Al2O3 ALD on samples with exposed BiFeO3 and SrRuO3 05/17/2021 Request for non-standard materials in Savannah. Savannah ALD (savannah) Request approved. Please see process staff for details.
70-nm-thick Al2O3 ALD deposition by Fiji-1 in SNF 05/13/2021 Request for depositon that is thicker than allowed. Request approved.
PT-DSE etching of silicon to undercut lithium niobate structures 05/13/2021 Request documenting data collection to enable LiNb processing on PT-DSE Request approved
Stress Testing with temperature cycling 05/04/2021 Request to use the temperature capabiities of the Flexus. Flexus 2320 Stress Tester (stresstest) Request approved.
Returning Si/SOI (Si-on-insulator) to Clean Group for CMOS FEOL after UV 05/04/2021 Cleanliness category exception documented. Request approved. Please see process staff for details.
Use of Photoresist MIR701 in SNF 04/20/2021 Request to bring new resist in to SNF. Request approved. Please see process staff for details.
Proprietary resist use in SNF 04/20/2021 Request to use proprietary formulation in SNF litho tools. Request approved. Please see process staff for details.
Absorption Spectroscopy of Y-27632 04/16/2021 Request to bring wet chemicals into Ocean (151) Jasco UV-Vis-NIR (jasco-uv-vis-nir) Request approved.
Request to use SOG in SNF 04/08/2021 Process flow documentation for SOG in SNF Headway Manual Resist Spinner (headway2) Request approved.

Pages